Plastic injection molding for railway components

Bemar Plast has been a contract injection molder since 1995, in San Giovanni Ilarione near Verona, Italy, producing technical thermoplastic components for the railway industry. We assess the material with you against the fire safety requirements of the project, mold parts weighing up to 1.8 kg (≈ 4 lb) in batches from 1,000 parts and, on request, store the mold, which remains your property.

At a glance

What we make
technical thermoplastic components
Typical materials
glass-filled PA, PC, PC/ABS, PBT, in grades assessed for the project
Fire and smoke
EN 45545-2 requirements assessed with you on the material grade
Presses
13, from 10 to 480 t, molds up to 900 mm (≈ 35.4 in) high
Part weight
up to 1.8 kg (≈ 4 lb), shot weight in PS
Quantities
1,000 to 1 million parts a year per part number
Molds
designed in-house or your own, stored in our warehouse on request
Quality
ISO 9001:2015, IMQ No. 9190.BMRP
The Bemar Plast molding shop in San Giovanni Ilarione, near Verona, Italy, with injection molding presses and robots

Why an Italian supplier

We mold every part in our own plant near Verona, Italy. For European companies, that means a short, transparent supply chain with a single point of contact.

The Bemar Plast production team in the molding shop
  • Every part molded in Italy

    We mold every part in our plant in San Giovanni Ilarione, under an ISO 9001:2015 certified quality system, with documented dimensional inspection. 3D-printed prototypes are made in Italy too.

  • A European supply chain

    For customers in the European Union: no customs formalities, Central European Time (CET), single-market rules. Customers outside the EU (UK, Switzerland, US, Canada): standard export customs procedures apply.

  • Molds built in Italy or China, your choice

    On request we prepare a dual quote, Italy and Asia, so you can compare cost and lead time. Every mold is built by qualified partners to our technical specification; design approval, tryout and maintenance stay with us.

  • One technical point of contact

    You talk directly to the people who design and mold your part, from feasibility to finished component.

When we are the right partner for railway projects

We are a good fit if

  • you need technical plastic components in a material to be assessed against EN 45545-2
  • you plan batches of 1,000 parts or more, including repeat orders over the years
  • you have a mold to transfer and want it stored by your molder
  • you want a single supplier for molding, welding, assembly and packaging

We are not the right choice if

  • the material required is a high-performance specialty polymer, which we do not normally mold
  • you need only a few units to check form or fit: in that case we suggest 3D printing
  • the decision rests on the lowest price alone

What the railway industry requires of a plastic component

Requirements depend on the vehicle, the position of the component and the rolling stock manufacturer's specifications. These are the typical ones in the industry, and how we address them.

  • Fire behavior

    In Europe, materials for rail vehicles are assessed to EN 45545-2, which sets requirements for flame spread, smoke and toxicity according to the position of the component and the hazard level, from HL1 to HL3. Compliance depends on the material grade and is documented by test reports: we assess it with you before choosing the material. For projects outside Europe, for example in North America, where specifications often refer to NFPA 130, we check the requirements in your specifications.

  • Medium and large parts

    Our 480 t press takes molds with a tie-bar spacing of 811 × 785 mm (≈ 31.9 × 30.9 in) and a mold height of up to 900 mm (≈ 35.4 in), with a shot weight of up to 1,787 g (≈ 3.9 lb) in PS.

  • Filled and flame-retardant materials

    Glass-filled engineering polymers and flame-retardant grades require drying and controlled mold temperatures. Every line has a molecular sieve dehumidifying dryer and a mold temperature controller, up to 180 °C (356 °F) on the lines that need it.

  • Continuity over time

    In the railway industry volumes are often modest, but supply lasts for years. The mold always remains your property and, on request, we store it in our mold warehouse, treated with specific protective products and looked after by our technicians.

Engineering polymer pellets poured from a scoop
A mold lifted by a hoist next to an injection molding press

New molds or your own

We can design the mold for a new component or put the one you already have into production.

  • In-house mold design

    We design the mold in our engineering department. It is built by partners in Italy or China, your choice, to our technical specification; on request we prepare a dual quote, Italy and Asia.

  • Tryout and maintenance

    3D design approval, mold tryout and mold maintenance stay with us.

  • Customer-owned molds

    Molding with customer-owned molds is the core of our business: molds transferred from another supplier, or molds you have had built yourself.

Checking the color of a molded component with a portable colorimeter

Quality you can measure

On cosmetic components, we check color with a spectrophotometer and a colorimeter.

Dimensions are measured by the KEYENCE IM-X1000 image measurement system: the part is placed on the stage, with no fixtures, and the values are compared with the drawing. The result is an OK/NG judgment with an inspection report.

Quality system
ISO 9001 since 2013, now ISO 9001:2015 (IMQ certificate No. 9190.BMRP)
Valid
until June 27, 2028
Download the certificate (PDF)

Molding technologies for railway components

All of them in-house, in our plant in San Giovanni Ilarione, from molding to the assembled part.

  • One half of an injection mold standing upright in the Bemar Plast workshop

    Molding up to 480 t

    Technical components in engineering and commodity polymers, from small parts up to 1.8 kg, on 13 presses from 10 to 480 t.

  • Overmolding and insert molding

    Metal inserts or previously molded components encapsulated in the part during molding.

  • Two-shot (2K) molding

    Two materials or two colors in a single cycle, on presses with a rotary table: no subsequent assembly.

  • Ultrasonic welding

    On our own in-house machine, to join plastic components without adhesives.

  • Assembly and packaging

    Subassembly, labeling and packaging agreed with you.

Frequently asked questions about railway components

Answers to the questions railway buyers and engineering teams ask us most often.

Do you make plastic components for the railway industry?

Yes: Bemar Plast is a contract injection molder of technical thermoplastic components for the railway industry, made to customer drawings. We produce in our plant in San Giovanni Ilarione, near Verona, Italy, on 13 presses from 10 to 480 t.

Do the materials you mold comply with EN 45545-2?

Compliance with EN 45545-2 depends on the material grade and on the requirement that applies to the component, and is documented by the material's test reports. We assess it with you, based on your specifications, before choosing the material and building the mold.

What are hazard levels HL1, HL2 and HL3?

HL1, HL2 and HL3 are the three hazard levels used in EN 45545-2. They depend on the operation category and the vehicle design category, for example how much of the route runs through tunnels: the higher the level, the stricter the requirements for flame, smoke and toxicity of the material.

Which materials do you use for railway components?

We mainly use engineering polymers such as glass-filled polyamides, PC, PC/ABS and PBT, in grades that meet the project requirements. We do not normally mold high-performance specialty polymers.

How large can a part be?

A part can have a shot weight of up to about 1.8 kg (≈ 4 lb) in PS on our 480 t press, which takes molds with a tie-bar spacing of 811 × 785 mm (≈ 31.9 × 30.9 in) and a mold height of up to 900 mm (≈ 35.4 in).

What is the minimum order quantity?

We recommend at least 1,000 parts: below that quantity, the cost of the mold weighs too heavily on each part. For form and fit checks on a few units, we offer 3D-printed prototypes.

Can you store the mold between batches?

Yes. The mold always belongs to the customer; on request we store it in our mold warehouse, where it is treated with specific protective products and looked after by our technicians to extend its service life.

Can we transfer an existing mold to you?

Yes: molding with customer-owned molds is the core of our business, whether the mold comes from another supplier or you have had it built yourself. We take care of molding and secondary operations.

Where are the molds built?

New molds are designed by us and built by partners in Italy or China, your choice, to our technical specification. Molding always takes place in our plant in Italy.

What certification does your quality system hold?

Our quality management system is certified to ISO 9001:2015 by IMQ, certificate No. 9190.BMRP, for the injection molding of thermoplastic materials and technical articles. We have been ISO 9001 certified since 2013.

What do you need to prepare a quote?

To prepare a quote we need the 2D drawing or 3D model (STEP, IGES or PDF), approximate annual quantities, the tolerance requirements and the fire safety requirement that applies to the component, for example the EN 45545-2 hazard level. If some data is missing, we define it together.

Send us your drawing, and we will tell you how to mold it

We reply with a technical assessment and a quote. To prepare them, we need three pieces of information about your component.

  1. The part

    The 2D drawing or 3D model of the component.

    • STEP
    • IGES
    • PDF
  2. Material and annual volume

    The required material, or the part's operating conditions if the material has yet to be chosen. Then the approximate annual volume.

  3. Cosmetic requirements and tolerances

    Visible surfaces, color and finish, and the critical tolerances to be met.

If you do not have all the data yet, write to us anyway: we will define it together.

Hours
Monday–Friday, 8 a.m.–6 p.m. Italian time (2 a.m.–noon ET)

Page maintained by the Bemar Plast Team. Last updated: November 17, 2026.